With a large 6m slope towards the front of the Belleview site, heading away from the planned 52 town houses, childcare facility and 8 retail / commercial shop fronts, we were able to carefully plan and position the sewerage layout to fully encompass a gravity sewerage system assisted by the natural fall of the land.
With well planned positioning of the sewer grade PVC pipes, we were able to reduce the pipe lengths connecting to the two main sewer maintenance holes. Through this planned placement, reducing the amount of material used overall lead to a reduction of cost whilst successfully maintaining services to all lots on the Belleview site.
The two main sewer maintenance holes on the Belleview site, accommodate adequate size for maintenance at a future time where as other structures are often smaller and only allow for inspection.